Six steps from first call to a dry hand-back. We work in the shutdown window, with equipment stopped and locked out – never while lines run.
Photos, a call or a site visit. We agree assets, contaminants and the shutdown window, and confirm what dry ice will and won’t do.
Your team isolates and locks out under your site procedures. Electrical isolation is tested by a licensed electrician. We sign your permits and inductions.
Sensors, seals, labels, bearings and open electrics are masked. Exclusion zone set up, CO₂ monitoring and ventilation in place.
Test area first for your sign-off, then the clean, worked like a paintbrush around critical parts.
Removed soil is vacuumed or swept up. Dry ice leaves no water, grit or chemical waste – only what came off.
Area handed back dry. Report with before/after photos, areas cleaned, settings used and any issues found, signed on site.